Summary for Test 2022-12-27-8-5
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Sample Information
| Sample Taken Date | 12/27/2022 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/28/2022 |
| Sample type | Quality Assurance | A brief description of the sample | #6 x 2-6 |
| The quantity of what the sample constitutes | 8 Samples from lots 1-2 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Osiel | Last name of sampler or witnessed by | Ramirez |
| Title of sampler | Quality Assurance Inspector | Telephone number of sampler | (562) 3605216 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | RKR Steel Welding | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | L123-124-22 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 074822 |
| Hoop Manufacturer Lot Number(s) | Lots 1-2 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | #6 |
| Diameter of Hoop | 2'-6" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | Cascade Steel |
| Welding Company | RKR Steel Welding | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2022-12-27-8
DIME Test ID: 2022-12-27-8-5
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2023-01-11
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 01/11/2023
UTM: 400kip
Temperature: 72 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 2 | 2 | 6/19mm | 0.44 | 42171.39 | 95844 | Ok Necking | spaine |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 1/11/2023 ✔
