Summary for Test 2022-10-21-62-2
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 214524 DEA: 07304504 EFIS: 0714000067 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-57-R0.0/R4.5 |
| Award Date | 06/11/2020 |
| Closeout Date | 04/03/2025 |
| Work Description | CONCRETE PAVEMENT, CONCRETE BARRIER, AND ELECTRICAL WORK. |
| Location Description | LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 10/21/2022 | Sample Unique Key | 62 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/22/2022 | Sample type | Quality Assurance |
| A brief description of the sample | JPCP Beams | The quantity of what the sample constitutes | 10 Cubic Yards |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Edmond |
| Last name of sampler or witnessed by | Jabbour | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 22-2836 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vanguard Batch Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 57030SL |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 12434 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Wheelbarrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-10-21-62
DIME Test ID: 2022-10-21-62-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-01-04
Test Results
Input Type: Measured
Tester's full name: Edmond Jabbour
Date of test: 10/21/2022
Air Content: 2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/4/2023 ✔
