Summary for Test 2022-12-28-11-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 214524 DEA: 07304504 EFIS: 0714000067 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-57-R0.0/R4.5 |
| Award Date | 06/11/2020 |
| Closeout Date | 04/03/2025 |
| Work Description | CONCRETE PAVEMENT, CONCRETE BARRIER, AND ELECTRICAL WORK. |
| Location Description | LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 12/28/2022 | Sample Unique Key | 11 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/03/2023 | Sample type | Department Acceptance |
| A brief description of the sample | 3/8" HMA Dike 64245-2 | The quantity of what the sample constitutes | 20 tons |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Seifu |
| Last name of sampler or witnessed by | Mersha | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | 22-0385 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Materials Irwindale | |
| Transportation Laboratory (TL) Number | 121974 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/8 inch | Lot number | |
| Sublot number | HMA Mix Number | NA | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2022-12-28-11
DIME Test ID: 2022-12-28-11-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-01-04
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Arnold Truong
Date of test: 01/03/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: no data
Mass of the specimen and specimen basket assembly prior to ignition: no data
Mass of HMA Sample prior to ignition: 1540.4 g
Mass Loss: no data
Mass of aggregate remaining after ignition: 1436.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: no data
Test Temperature: 1000.4 F
Corrected Asphalt Binder Content: 6.75 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/4/2023 ✔
