Summary for Test 2022-12-16-25-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 993646 DEA: 080R1414 EFIS: 0815000200 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R100.0/R125.0 |
| Award Date | 05/11/2022 |
| Closeout Date | 03/27/2024 |
| Work Description | ROADWAY EXCAVATION, DESERT TORTOISE FENCE, AND BONDED FIBER MATRIX. |
| Location Description | SAN BERNARDINO COUNTY AT AND NEAR FENNER FROM ESSEX ROAD OVERCROSSING TO 4.5 MILES EAST OF WATER ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 09/13/2022) |
Sample Information
| Sample Taken Date | 12/16/2022 | Sample Unique Key | 25 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/16/2022 |
| Sample type | Quality Assurance | A brief description of the sample | Soil |
| The quantity of what the sample constitutes | 17982SQF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | francisco | Last name of sampler or witnessed by | Ruvaicaba |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | 12162022 TEST 04 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOBSITE | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-12-16-25
DIME Test ID: 2022-12-16-25-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-12-21
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: Yes
Input Type: Measured
Tester's full name: francisco Ruvaicaba Jr.
Date of test: 12/16/2022
Gage No.: 33196
Test No.: 4
Nuclear By: francisco Ruvaicaba Jr
Non-Bias Plan No.: 1
Depth: 8
Material No.: NATIVE
Material Type: SUBGRADE
Impact By: francisco Ruvaicaba Jr
Standard Count Density: 1801 g/cc
Count or Density 1: 998 g/cc
Count or Density 2: 995 g/cc
Count or Density 3: 977 g/cc
Count or Density 4: 943 g/cc
Count or Density 5: 932 g/cc
Standard Count Moisture: 756 g/cc
Moisture Count 1: 80 g/cc
Moisture Count 2: 75 g/cc
Moisture Count 3: 100 g/cc
Moisture Count 4: 74 g/cc
Moisture Count 5: 73 g/cc
Density: 2.02
Moisture: 0.08
Sum of Count or Density: 4845 g/cc
Average of Count or Density: 969 g/cc
Sum of Moisture Count: 402 g/cc
Average of Moisture Count: 80 g/cc
Count Ratio Density: 0.54
Count Ratio Moisture: 0.11
Calculated Percent Relative Compaction: 91.6 %
Reported Percent Relative Compaction: 92 %
General comments (publicly viewable) (Max 1000 characters): density spec 90%
Test was verified on 12/21/2022 ✔
