Summary for Test 2022-12-13-39-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 993424
DEA: 04281204
EFIS: 0400000769
DIST-CO-RTE-PM04-NAP-29,221-5.5/6.7,0.0/0.2
Award Date03/21/2022
Closeout DateNot set
Work DescriptionHMA, RDWY EXCAVATION, STRUCTURAL CONC AND MODIFYING LIGHTING SYSTEMS.
Location DescriptionNAPA COUNTY NEAR NAPA ON ROUTE 29 FROM 0.7 MILE SOUTH TO 0.5 MILE NORTH OF ROUTE 221 AND ON ROUTE 221 FROM 0.2 MILE NORTH OF ROUTE 29 TO ROUTE 29
QA Service Level1 (Verified on 12/08/2021)

Sample Information

Sample Taken Date12/13/2022 Sample Unique Key39
Date that the sample was received by the laboratory/organization performing the testing12/14/2022 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes1
From where was the sample collectedFabricator First name of sampler or witnessed byBrad
Last name of sampler or witnessed byStreeter Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber Corp
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)22331-1
Material/Compound/Elastomer IDNA Samples Representing1
Description (size)4x14x16 Comments
Description (Number of Shims)8 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch NumberNA

Test Details

DIME Sample ID: 2022-12-13-39
DIME Test ID: 2022-12-13-39-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2022-12-20

Test Results


Input Type: Measured
Tester's full name: Rachael Chavez
Date of test: 12/20/2022
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/20/2022 ✔