Summary for Test 2022-11-03-76-1
Test performed: CTM 521-June 2012Project Information
| Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
| Award Date | 03/01/2021 |
| Closeout Date | Not set |
| Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
| Location Description | 101 freeway in Summerland, CA |
| QA Service Level | 1 (Verified on 05/06/2021) |
Sample Information
| Sample Taken Date | 11/03/2022 | Sample Unique Key | 76 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/04/2022 |
| Sample type | Quality Control | A brief description of the sample | structural concrete |
| The quantity of what the sample constitutes | 2 cylinders | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ryan | Last name of sampler or witnessed by | Benitez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marietta | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 725A1Z0P |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 3432137 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | SW7B CIP wall | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-11-03-76
DIME Test ID: 2022-11-03-76-1
Testing Lab: Sequoia Consultants
Test Method: CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2022-12-15
Test Results
Number of specimens: 2
Input Type: Calculated
Tester's full name: Carlos Nunez
Date of test: 12/01/2022
Correction factor: 1
Cylinder Age: 28 days
Break Description of Cylinder 1 (if not 'cone'): columnar
Break Description of Cylinder 2 (if not 'cone'): columnar
Average Compressive Strength (to nearest 10): 4860 lb/in^2
Compressive Strength of Cylinder 1: 4790 lb/in^2
Compressive Strength of Cylinder 2: 4924 lb/in^2
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/15/2022 ✔