Summary for Test 2022-11-29-38-4
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993235 DEA: 051H4504 EFIS: 0516000075 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-154-R31.8/R32.1 |
| Award Date | 11/22/2021 |
| Closeout Date | 07/31/2024 |
| Work Description | CONSTRUCT CIDH CONCRETE PILES AND STRUCTURAL CONCRETE BRIDGE. |
| Location Description | SANTA BARBARA COUNTY IN AND NEAR SANTA BARBARA FROM PRIMAVERA ROAD UNDERCROSSING TO LA COLINA ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 10/06/2021) |
Sample Information
| Sample Taken Date | 11/29/2022 | Sample Unique Key | 38 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/07/2022 |
| Sample type | Quality Assurance | A brief description of the sample | #11 hrc couplrs |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | John | Last name of sampler or witnessed by | Spaloone |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martinez CMC HRC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
| Rebar Size | #11 | Coupler Model | HRC 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 73126153 74124730 | Rebar Heat Number(s) | 274422 |
| Rebar Size 2 | Coupler Unique ID | TP-17-03 |
Test Details
DIME Sample ID: 2022-11-29-38
DIME Test ID: 2022-11-29-38-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2022-12-14
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 12/13/2022
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | No. 11/36mm | 1 | 0 | 1.56 | 150879 | 96717 | Ok Necking | spaine |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 12/14/2022 ✔
