Summary for Test 2022-11-09-22-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 993545 DEA: 07328504 EFIS: 0716000178 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R44.7/R52.1 |
| Award Date | 04/01/2022 |
| Closeout Date | 09/24/2024 |
| Work Description | INSTALL DPP INFILTRATION AREA & CONSTRUCT MAINTENANCE VEHICLE PULLOUT |
| Location Description | LOS ANGELES COUNTY FROM 0.4 MILE EAST OF SOUTH LONE HILL AVENUE UNDERCROSSING TO COUNTY LINE |
| QA Service Level | 1 (Verified on 05/11/2022) |
Sample Information
| Sample Taken Date | 11/09/2022 | Sample Unique Key | 22 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/05/2022 | Sample type | Verification |
| A brief description of the sample | PG Asphalt Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Vulcan QC |
| Last name of sampler or witnessed by | Vulcan QC | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0764-22 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan-Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2022-11-09-22
DIME Test ID: 2022-11-09-22-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-12-15
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 12/08/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.275 grams
Mass of empty container #2: 169.567 grams
Mass of container #1 before test (m1i): 202.390 grams
Mass of container #2 before test (m2i): 204.260 grams
Mass of container #1 after test (m1f): 202.279 grams
Mass of container #2 after test (m2f): 204.150 grams
Average mass change: -0.317 percent
General comments (publicly viewable) (Max 1000 characters): -0.317 + 0.006 = -0.311
Test was verified on 12/15/2022 ✔
