Summary for Test 2022-11-17-33-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 993183
DEA: 031H2704
EFIS: 0316000082
DIST-CO-RTE-PM03-YUB-70-R11.2/13.5
Award Date10/14/2021
Closeout DateNot set
Work DescriptionUPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER.
Location DescriptionYUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD
QA Service Level1 (Verified on 08/16/2021)

Sample Information

Sample Taken Date11/17/2022 Sample Unique Key33
Date that the sample was received by the laboratory/organization performing the testing11/17/2022 Sample typeQuality Control
A brief description of the sampleWashed Concrete Sand The quantity of what the sample constitutes1 Day
From where was the sample collectedJob Site First name of sampler or witnessed bySpencer
Last name of sampler or witnessed byKibbe Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCemex
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-58-0006
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedNo Information
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design number1615645 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2022-11-17-33
DIME Test ID: 2022-11-17-33-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-11-22

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 11/18/2022
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 47
Sand reading (test 1): 39
Sand equivalent (test 1): 83
Sand equivalent before temperature correction: 83
Sand equivalent after temperature correction: 83
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/22/2022 ✔