Summary for Test 2013-03-13-9217102-1

Test performed: CTM 213-December 2012

Project Information

Project IdentifiersProject ID: 1346
DEA: 040120S4
EFIS: 0400000026
DIST-CO-RTE-PM04-SF-80-12.7/13.2
Award Date02/04/2010
Closeout Date01/25/2018
Work DescriptionCONSTRUCT BRIDGES AND ROADWAY AND INSTALL ELECTRICAL SYSTEM
Location DescriptionTHE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 0.6 KM EAST OF YERBA BUENA TUNNEL
QA Service Level1 (Verified on 10/29/2012)

Sample Information

Sample Taken Date03/13/2013 Sample Unique Key9217102
Date that the sample was received by the laboratory/organization performing the testing03/06/2013 Sample typeAnnual Source Testing
A brief description of the sampleSand The quantity of what the sample constitutes1 bag
From where was the sample collectedSource First name of sampler or witnessed byBill
Last name of sampler or witnessed byHowe Title of samplerEngr
Telephone number of samplerNot set Laboratory sample identificationNot set
Linked DIME Sample IDNot set The fabricator/manufacturer/facility nameHanson
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Hanson
The fabricator's/manufacturer's product name for the sampleNot set The fabricator/manufacturer designation for the sampleNot set
The plant numberNot set A detailed description of where the material sample was collectedAngel Island
Where the material sample would have been placed if not sampledNot set Primary Aggregate Nominal Size
The concrete mix design number Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2013-03-13-9217102
DIME Test ID: 2013-03-13-9217102-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 213-December 2012: Method of Test for Organic Impurities in Concrete Sand
Test Release Date: 2013-03-13

Test Results


Input Type: Measured
Tester's full name: Thomas Stinnett
Date of test: 03/13/2013
Is the sample satisfactory or not?: Yes
Does debris exist: No
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/13/2013 ✔