Summary for Test 2022-10-28-42-2

Test performed: CTM 208-September 2011

Project Information

Project IdentifiersProject ID: 993611
DEA: 112N1154
EFIS: 1121000144
DIST-CO-RTE-PM11-IMP-115-R3.2/R8.8,9.5/21.2
Award Date05/03/2022
Closeout Date05/02/2023
Work DescriptionASPHALT RUBBER BINDER CHIP SEAL, PAVEMENT MARKINGS & SHOULDER BACKING.
Location DescriptionIMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM ROUTE 115/8 SEPARATION TO TOWLAND ROAD AND FROM WEST JUNCTION EVAN HEWES HIGHWAY TO EAST JUNCTION ROUTE 78/115
QA Service Level1 (Verified on 03/07/2022)

Sample Information

Sample Taken Date10/28/2022 Sample Unique Key42
Date that the sample was received by the laboratory/organization performing the testing11/09/2022 Sample typePer Request
A brief description of the sampleCRM/HI-NAT. The quantity of what the sample constitutes1 bag
From where was the sample collectedSupplier First name of sampler or witnessed byAPS
Last name of sampler or witnessed byAPS Title of sampler
Telephone number of sampler Laboratory sample identification0856
Linked DIME Sample ID The fabricator/manufacturer/facility nameRubber plant Coachella
Transportation Laboratory (TL) NumberC003312 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeCrumb Rubber Modifier CRM TypeHigh Natural
Crumb Rubber Modifier Mix Number

Test Details

DIME Sample ID: 2022-10-28-42
DIME Test ID: 2022-10-28-42-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 208-September 2011: Method of Test for Apparent Specific Gravity of Fine Aggregates
Test Release Date: 2022-11-15

Test Results


Input Type: Calculated
Tester's full name: Zaid Abdelkhaliq
Date of test: 11/14/2022
Specific Gravity: 1.17
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/15/2022 ✔