Summary for Test 2022-11-09-4-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 214336 DEA: 07302404 EFIS: 0713000488 |
---|---|
DIST-CO-RTE-PM | 07-VEN-101-37/40 |
Award Date | 11/17/2020 |
Closeout Date | 09/24/2024 |
Work Description | PADRE JUAN REHAB |
Location Description | VEN 101 |
QA Service Level | 1 (Verified on 02/26/2021) |
Sample Information
Sample Taken Date | 11/09/2022 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 11/09/2022 |
Sample type | Quality Assurance | A brief description of the sample | Aggregate |
The quantity of what the sample constitutes | 3136 sq. ft. | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Ian | Last name of sampler or witnessed by | Snyder |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 22-3016 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | n/a | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | n/a |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-11-09-4
DIME Test ID: 2022-11-09-4-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-11-10
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Ian Snyder
Date of test: 11/09/2022
Gage No.: 37847
Test No.: 2
Nuclear By: Ian Snyder
Non-Bias Plan No.: 7
Depth: 5
Material No.: Aggregate Base
Material Type: Aggregate Base
Impact By: Ian Snyder
Standard Count Density: 2104 g/cc
Count or Density 1: 2021 g/cc
Count or Density 2: 2046 g/cc
Count or Density 3: 2050 g/cc
Standard Count Moisture: 707 g/cc
Moisture Count 1: 190 g/cc
Moisture Count 2: 177 g/cc
Moisture Count 3: 172 g/cc
Sum of Count or Density: 6117 g/cc
Average of Count or Density: 2039 g/cc
Sum of Moisture Count: 539 g/cc
Average of Moisture Count: 180 g/cc
Count Ratio Density: 0.97
Count Ratio Moisture: 0.25
Calculated Percent Relative Compaction: 95.9 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/10/2022 ✔