Summary for Test 2022-10-07-59-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
| Award Date | 02/05/2021 |
| Closeout Date | Not set |
| Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
| Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
| QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
| Sample Taken Date | 10/07/2022 | Sample Unique Key | 59 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/11/2022 | Sample type | Per Request |
| A brief description of the sample | PG Asphalt Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Gerardo |
| Last name of sampler or witnessed by | Zubieta | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0683-22 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | All American-Corona | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2022-10-07-59
DIME Test ID: 2022-10-07-59-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-11-08
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Majid Essa
Date of test: 10/13/2022
Any material loss from containers during heating process/testing?: Yes
Mass of empty container #1: 167.311 grams
Mass of empty container #2: 169.576 grams
Mass of container #1 before test (m1i): 201.870 grams
Mass of container #2 before test (m2i): 204.654 grams
Mass of container #1 after test (m1f): 201.817 grams
Mass of container #2 after test (m2f): 204.599 grams
Average mass change: -0.155 percent
General comments (publicly viewable) (Max 1000 characters): -.155+.006=-0.149
Corrected
Test was verified on 11/8/2022 ✔
