Summary for Test 2016-09-19-7-5
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 210948 DEA: 07287604 EFIS: 0700020928 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-8.5/9.4 |
| Award Date | 12/30/2015 |
| Closeout Date | 08/22/2018 |
| Work Description | PLACE CONCRETE BARRIER, RAILING, AND LIGHTING |
| Location Description | LA COUNTY FROM BARHAM BOULEVARD OVERCROSSING BRIDGE TO 720 FEET SOUTH OF MULHALLAND DRIVEOVERCROSSING BRIDGE |
| QA Service Level | 1 (Verified on 03/23/2016) |
Sample Information
| Sample Taken Date | 09/19/2016 | Sample Unique Key | 7 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/23/2016 |
| Sample type | Quality Assurance | A brief description of the sample | Flash Welded Rebar Hoops |
| The quantity of what the sample constitutes | 8 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | Churchill |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | TNT Rebar | Transportation Laboratory (TL) Number | C648125 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | L0211816 | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Authorization Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | PL141044777 |
| Hoop Manufacturer Lot Number(s) | 1 2 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | 4 |
| Diameter of Hoop | 2'-2" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | TNT Rebar |
| Welding Company | TNT Rebar | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2016-09-19-7
DIME Test ID: 2016-09-19-7-5
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2016-09-27
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 09/26/2016
UTM: 75KIP
Temperature: 72 F
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 2 | #4/13mm | 0.2 | 19762 | 98810 | necking okay | Brian |
General comments (publicly viewable) (Max 1000 characters): necking okay
Test Graph
WARNING: No graph data imported from Instron machine.
Test was verified on 9/27/2016 ✔
