Summary for Test 2022-10-19-37-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 993122 DEA: 07322304 EFIS: 0716000054 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-110-22.8 |
| Award Date | 10/04/2021 |
| Closeout Date | 09/24/2024 |
| Work Description | CONSTRUCT AND REPLACE BRIDGE RAILS. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT FIFTH STREET OVERCROSSING AND AT SIXTH STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 08/04/2021) |
Sample Information
| Sample Taken Date | 10/19/2022 | Sample Unique Key | 37 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/19/2022 |
| Sample type | Department Acceptance | A brief description of the sample | Soil for Subgrade. |
| The quantity of what the sample constitutes | 45 yd2 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Rosauro | Last name of sampler or witnessed by | Nogoy |
| Title of sampler | TEC | Telephone number of sampler | 2137939321 |
| Laboratory sample identification | 22-2787 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Subgrade |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at subgrade. | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-10-19-37
DIME Test ID: 2022-10-19-37-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-10-27
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Rosauro Nogoy
Date of test: 10/19/2022
Gage No.: 60202
Test No.: 1
Nuclear By: Rosauro Nogoy
Non-Bias Plan No.: 2
Depth: 12 in
Material No.: On site
Material Type: Subgrade
Impact By: Rosauro Nogoy
Standard Count Density: 2359 g/cc
Count or Density 1: 2.04 g/cc
Count or Density 2: 1.98 g/cc
Count or Density 3: 2 g/cc
Standard Count Moisture: 628 g/cc
Moisture Count 1: 0.16 g/cc
Moisture Count 2: 0.17 g/cc
Moisture Count 3: 0.17 g/cc
Sum of Count or Density: 6.02 g/cc
Average of Count or Density: 2.01 g/cc
Sum of Moisture Count: 0.5 g/cc
Average of Moisture Count: 0.17 g/cc
Calculated Percent Relative Compaction: 91.6 %
Reported Percent Relative Compaction: 92 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/27/2022 ✔
