Summary for Test 2022-10-13-5-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 993442
DEA: 07323304
EFIS: 0716000063
DIST-CO-RTE-PM07-LA-60-R28.0/R30.4
Award Date02/17/2022
Closeout Date09/24/2024
Work DescriptionINSTALL DPP INFILTRATION AND CONSTRUCT MAINTENANCE VEHICLE PULLOUT.
Location DescriptionLOS ANGLES COUNTY IN POMONA AT VARIOUS LOCATIONS FROM PHILLIPS RANCH ROAD OVERCROSSING TO 0.1 MILE EAST OF RESERVOIR STREET UNDERCROSSING
QA Service Level1 (Verified on 12/16/2021)

Sample Information

Sample Taken Date10/13/2022 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing10/13/2022 Sample typeDepartment Acceptance
A brief description of the sampleSubgrade The quantity of what the sample constitutes1692 SF
From where was the sample collectedJob Site First name of sampler or witnessed byJacinto
Last name of sampler or witnessed byVillanueva Title of samplerTEC
Telephone number of sampler8182096574 Laboratory sample identification22-2732
Linked DIME Sample ID The fabricator/manufacturer/facility nameDesign Build Eng.
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFrom various locations at subgrade.
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2022-10-13-5
DIME Test ID: 2022-10-13-5-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-10-13

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 10/13/2022
Gage No.: 60247
Test No.: 1
Nuclear By: jacinto villanueva
Non-Bias Plan No.: 3
Depth: 5
Material No.: on site
Material Type: subgrade
Impact By: jacinto villanueva
Standard Count Density: 2164 g/cc
Count or Density 1: 1.82 g/cc
Count or Density 2: 1.67 g/cc
Count or Density 3: 1.62 g/cc
Standard Count Moisture: 636 g/cc
Moisture Count 1: 0.11 g/cc
Moisture Count 2: 0.08 g/cc
Moisture Count 3: 0.05 g/cc
Sum of Count or Density: 5.11 g/cc
Average of Count or Density: 1.7 g/cc
Sum of Moisture Count: 0.24 g/cc
Average of Moisture Count: 0.08 g/cc
Calculated Percent Relative Compaction: 87.4 %
Reported Percent Relative Compaction: 87 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/13/2022 ✔