Summary for Test 2022-08-24-70-1

Test performed: CTM 208-September 2011

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award Date04/03/2020
Closeout Date06/06/2024
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date08/24/2022 Sample Unique Key70
Date that the sample was received by the laboratory/organization performing the testing09/21/2022 Sample typeVerification
A brief description of the sampleCRM The quantity of what the sample constitutes1 Qt. CRM
From where was the sample collectedManufacturer First name of sampler or witnessed byVulcan
Last name of sampler or witnessed byQC Title of sampler
Telephone number of sampler Laboratory sample identification0651G-22
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan Materials-Sun Valley #3
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeCrumb Rubber Modifier CRM TypeScrap Tire
Crumb Rubber Modifier Mix NumberNot set

Test Details

DIME Sample ID: 2022-08-24-70
DIME Test ID: 2022-08-24-70-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 208-September 2011: Method of Test for Apparent Specific Gravity of Fine Aggregates
Test Release Date: 2022-11-16

Test Results


Input Type: Calculated
Tester's full name: Amir Behjati
Date of test: 09/23/2022
Specific Gravity: 1.16
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/16/2022