Summary for Test 2022-09-18-8-1
Test performed: CTM 524-March 2013Project Information
| Project Identifiers | Project ID: 214524 DEA: 07304504 EFIS: 0714000067 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-57-R0.0/R4.5 |
| Award Date | 06/11/2020 |
| Closeout Date | 04/03/2025 |
| Work Description | CONCRETE PAVEMENT, CONCRETE BARRIER, AND ELECTRICAL WORK. |
| Location Description | LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 09/18/2022 | Sample Unique Key | 8 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/18/2022 |
| Sample type | Department Acceptance | A brief description of the sample | 6x6x21 beams |
| The quantity of what the sample constitutes | 130 CY | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Robert | Last name of sampler or witnessed by | Achuela |
| Title of sampler | MREA | Telephone number of sampler | |
| Laboratory sample identification | 22-2440 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Vanguard at the 57 Freeway | Transportation Laboratory (TL) Number | 22-2440 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 690HE4X12 |
|---|---|---|---|
| The truck number from where the sample was collected | NA | The batch plant ticket number from where the sample was collected | NA |
| Concrete batch plant | Vanguard at 57 Freeway | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | Skip loader to wheel barrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-09-18-8
DIME Test ID: 2022-09-18-8-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2022-10-10
Test Results
Number of specimens: 3
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: No
Is a beam dimensional correction factor used?: No
Input Type: Measured
Tester's full name: Robert Achuela
Date of test: 09/28/2022
Identification number: 22-2440
Width of specimen: 6 inch
Width of specimen 2: 6 inch
Width of specimen 3: 6 inch
Depth of specimen: 6.0625 inch
Depth of specimen 2: 6.125 inch
Depth of specimen 3: 6.125 inch
Span length of specimen: 18 inch
Span length of specimen 2: 18 inch
Span length of specimen 3: 18 inch
Maximum load applied: 7992 lb
Maximum load applied 2: 8118 lb
Maximum load applied 3: 8212 lb
Curing history and apparent moisture condition of the specimen: saturated
If specimen was capped, ground or if leather shims were used: no
Defects in specimen, including numbers of beams discarded during test: none
Age of specimen: 10 days
Age of specimen in hours: no data
Modulus of rupture: 680 psi
Modulus of rupture 2: 680 psi
Modulus of rupture 3: 690 psi
Modulus of rupture average: 680 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/10/2022 ✔