Summary for Test 2022-10-03-35-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 214524 DEA: 07304504 EFIS: 0714000067 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-57-R0.0/R4.5 |
| Award Date | 06/11/2020 |
| Closeout Date | 04/03/2025 |
| Work Description | CONCRETE PAVEMENT, CONCRETE BARRIER, AND ELECTRICAL WORK. |
| Location Description | LOS ANGELES COUNTY IN DIAMOND BAR AND CITY OF INDUSTRY FROM ORANGE COUNTY LINE TO ROUTE 57/60 SEPARATION |
| QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
| Sample Taken Date | 10/03/2022 | Sample Unique Key | 35 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/04/2022 |
| Sample type | Per Request | A brief description of the sample | PG Asphalt Binder |
| The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Josh | Last name of sampler or witnessed by | Delfuente |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0672-22 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Vulcan- Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Lunday Thagard Company-World Oil - South Gate CA | Multigrade | Yes |
| Multigrade Type | PG 64-16 / PG 64-10 | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2022-10-03-35
DIME Test ID: 2022-10-03-35-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-10-12
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 10/06/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 176.527 grams
Mass of empty container #2: 169.579 grams
Mass of container #1 before test (m1i): 211.559 grams
Mass of container #2 before test (m2i): 204.660 grams
Mass of container #1 after test (m1f): 210.158 grams
Mass of container #2 after test (m2f): 203.248 grams
Average mass change: -4.012 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/12/2022 ✔
