Summary for Test 2022-06-09-61-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 213598
DEA: 051F75U4
EFIS: 0518000092
DIST-CO-RTE-PM05-MON-101-R36.9/47.7
Award Date01/16/2019
Closeout Date01/11/2024
Work DescriptionCRCP, SEISMIC RETROFIT, BRIDGE WIDENING AND MEDIAN BARRIER
Location DescriptionMONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE
QA Service Level1 (Verified on 10/11/2018)

Sample Information

Sample Taken Date06/09/2022 Sample Unique Key61
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/09/2022
Sample typeQuality Assurance A brief description of the sampleOHL - Class 1 SubBase
The quantity of what the sample constitutes12-15 Truck loads From where was the sample collectedDistributor
First name of sampler or witnessed byMathew Last name of sampler or witnessed bySpencer
Title of samplerTET Telephone number of sampler8057790845
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameOHL - Stockpile Class 1 Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedOHL Stockpile
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2022-06-09-61
DIME Test ID: 2022-06-09-61-1
Testing Lab: CT D05 - Big Sur Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-10-05

Test Results


What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Salvador Zepeda
Date of test: 06/09/2022
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 89 %
Cumulative percent passing the 3/4 in. sieve: 86 %
Cumulative percent passing the 1/2 in. sieve: 76 %
Cumulative percent passing the 3/8 in. sieve: 69 %
Cumulative percent passing the #4 sieve: 55 %
Cumulative percent passing the #8 sieve: 85 %
General comments (publicly viewable) (Max 1000 characters): New crusher sample from 6-9-22, OHL placed material in field before Sequoia and Caltrans had test results.

Test was verified on 10/5/2022