Summary for Test 2022-08-19-63-1

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 213598
DEA: 051F75U4
EFIS: 0518000092
DIST-CO-RTE-PM05-MON-101-R36.9/47.7
Award Date01/16/2019
Closeout Date01/11/2024
Work DescriptionCRCP, SEISMIC RETROFIT, BRIDGE WIDENING AND MEDIAN BARRIER
Location DescriptionMONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE
QA Service Level1 (Verified on 10/11/2018)

Sample Information

Sample Taken Date08/19/2022 Sample Unique Key63
Date that the sample was received by the laboratory/organization performing the testing08/19/2022 Sample typeQuality Assurance
A brief description of the sampleNative Back Fill The quantity of what the sample constitutes1785 cy
From where was the sample collectedJob Site First name of sampler or witnessed bySalvador
Last name of sampler or witnessed byZepeda Title of samplerTET
Telephone number of sampler15594738770 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameNative soil
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleNative Back Fill
The fabricator/manufacturer designation for the sampleFrom the jobsite A detailed description of where the material sample was collectedAt the Jobsite collected
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2022-08-19-63
DIME Test ID: 2022-08-19-63-1
Testing Lab: CT D05 - Big Sur Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2022-10-05

Test Results


Is oversize material: No
Input Type: Calculated
Tester's full name: Salvador Zepeda
Date of test: 08/19/2022
In-place wet density: 1594.00
Highest adjust wet density: 1697.00
% Moisture: 406.0 %
Optimum Moisture: 81.2 %
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters): SB 101, ETW Median Wall north of Jolon Rd 90% compaction area

Test was verified on 10/5/2022 ✔