Summary for Test 2022-08-24-67-5
Test performed: CTM TEMP1-16Project Information
| Project Identifiers | Project ID: 993208 DEA: 034F38U4 EFIS: 0321000092 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-70-16.2/25.8 |
| Award Date | 11/04/2021 |
| Closeout Date | 07/15/2025 |
| Work Description | WIDEN SHOULDERS AND IMPROVE CLEAR RECOVERY ZONE. |
| Location Description | YUBA COUNTY NEAR MARYSVILLE FROM 0.2 MILE NORTH OF LAURELLEN ROAD TO SOUTH HONCUT CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/10/2021) |
Sample Information
| Sample Taken Date | 08/24/2022 | Sample Unique Key | 67 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/24/2022 | Sample type | Quality Control |
| A brief description of the sample | 4x8 concrete cylinders | The quantity of what the sample constitutes | days production |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Wilfredo |
| Last name of sampler or witnessed by | Bucaneg | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Rinker Materials | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | mix5 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 2 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Besser Hopper | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-08-24-67
DIME Test ID: 2022-08-24-67-5
Testing Lab: Rinker Materials
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2022-09-21
Test Results
Input Type: Calculated
Tester's full name: Wally Bucaneg
Date of test: 08/24/2022
Precast Maximum Curing Temperature: 150 °F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/21/2022 ✔
