Summary for Test 2022-09-20-24-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 09/20/2022 | Sample Unique Key | 24 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/21/2022 |
Sample type | Department Acceptance | A brief description of the sample | PCC Aggregate |
The quantity of what the sample constitutes | 3 Bags of Aggs | From where was the sample collected | Source |
First name of sampler or witnessed by | Avo | Last name of sampler or witnessed by | Karajian |
Title of sampler | TET | Telephone number of sampler | 12137986076 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Security Paving Company - La Mirada | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0025 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Hanson - Irwindale | The fabricator/manufacturer designation for the sample | |
The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
The concrete mix design number | G3-19-PCC-001 | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-09-20-24
DIME Test ID: 2022-09-20-24-1
Testing Lab: CT D07 - Plant Services
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-09-22
Test Results
What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Avo Karajian
Date of test: 09/21/2022
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 96 %
Cumulative percent passing the #8 sieve: 84 %
Cumulative percent passing the #16 sieve: 70 %
Cumulative percent passing the #30 sieve: 49 %
Cumulative percent passing the #50 sieve: 21 %
Cumulative percent passing the #100 sieve: 5 %
Cumulative percent passing the #200 sieve: 2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/22/2022 ✔