Summary for Test 2016-07-22-15-4

Test performed: CTM 301-March 2000

Project Information

Project IdentifiersProject ID: 210829
DEA: 07302904
EFIS: 0713000478
DIST-CO-RTE-PM07-LA-5-C43.9/C46.4
Award Date01/13/2016
Closeout Date06/25/2019
Work DescriptionREPLACE CONCRETE SLABS/PAVEMENT.
Location DescriptionIN LA, RT 5 TRUCK LANES CNTY LN ROAD OVERHEAD TO 0.2 MILE SOUTH OF WELDON CANYON OVERCROSSING
QA Service Level1 (Verified on 12/16/2015)

Sample Information

Sample Taken Date07/22/2016 Sample Unique Key15
Date that the sample was received by the laboratory/organization performing the testing08/01/2016 Sample typeDepartment Acceptance
A brief description of the sampleThree quarter inch Max Class Three Aggregate Base The quantity of what the sample constitutes2 Bags
From where was the sample collectedJob Site First name of sampler or witnessed bySonny
Last name of sampler or witnessed byNogoy Title of samplerTE
Telephone number of samplerUnknown Laboratory sample identification6301B
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameUnknown
Transportation Laboratory (TL) NumberC 923506 Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Unknown
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedRoadway
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1 inch
The concrete mix design numberUnknown Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2016-07-22-15
DIME Test ID: 2016-07-22-15-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2019-06-06

Test Results


How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Md Shahjahan
Date of test: 08/11/2016
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 95 %
As Received Gradation, Percent Passing 1/2 in. sieve: 83 %
As Received Gradation, Percent Passing 3/8 in. sieve: 75 %
As Received Gradation, Percent Passing #4 sieve: 58 %
As Received Gradation, Percent Passing #8 sieve: 46 %
As Received Gradation, Percent Passing #16 sieve: 35 %
As Received Gradation, Percent Passing #30 sieve: 27 %
As Received Gradation, Percent Passing #50 sieve: 19 %
As Received Gradation, Percent Passing #100 sieve: 12 %
As Received Gradation, Percent Passing #200 sieve: 8 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 87 %
As Used Gradation, Percent Passing 3/8 in. sieve: 79 %
As Used Gradation, Percent Passing #4 sieve: 61 %
As Used Gradation, Percent Passing #8 sieve: 48 %
As Used Gradation, Percent Passing #16 sieve: 37 %
As Used Gradation, Percent Passing #30 sieve: 28 %
As Used Gradation, Percent Passing #50 sieve: 20 %
As Used Gradation, Percent Passing #100 sieve: 13 %
As Used Gradation, Percent Passing #200 sieve: 8 %
R value: 84
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/30/2019 ✔