Summary for Test 2022-08-29-35-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 214486 DEA: 080K1224 EFIS: 0815000244 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-R28.6/37.5 |
| Award Date | 09/24/2021 |
| Closeout Date | 11/03/2025 |
| Work Description | REHBILIATATE EXISTING MAINLINE AND RAMP PAVEMENT |
| Location Description | SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE FROM OAK HILL ROAD OVERCROSSING TO 0.1 MILE SOUTH OF BEAR VALLEY ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 06/23/2021) |
Sample Information
| Sample Taken Date | 08/29/2022 | Sample Unique Key | 35 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/29/2022 |
| Sample type | Quality Assurance | A brief description of the sample | Soil |
| The quantity of what the sample constitutes | 375SQF | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | ALBERTO | Last name of sampler or witnessed by | PINEDA- GONZALEZ |
| Title of sampler | Caltrans Consultant | Telephone number of sampler | |
| Laboratory sample identification | 8292022 TEST 02 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | OMAR G |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOBSITE | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-08-29-35
DIME Test ID: 2022-08-29-35-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-09-02
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: ALBERTO PINEDA- GONZALEZ
Date of test: 08/29/2022
Gage No.: 80494
Test No.: 2
Nuclear By: ALBERTO PINEDA- GONZALEZ
Non-Bias Plan No.: 1
Depth: 7
Material No.: NATIVE
Material Type: SUBGRADE
Impact By: ALBERTO PINEDA- GONZALEZ
Standard Count Density: 2876 g/cc
Count or Density 1: 2002 g/cc
Count or Density 2: 1966 g/cc
Count or Density 3: 1934 g/cc
Standard Count Moisture: 729 g/cc
Moisture Count 1: 113 g/cc
Moisture Count 2: 139 g/cc
Moisture Count 3: 112 g/cc
Sum of Count or Density: 5902 g/cc
Average of Count or Density: 1967 g/cc
Sum of Moisture Count: 364 g/cc
Average of Moisture Count: 121 g/cc
Count Ratio Density: 0.68
Count Ratio Moisture: 0.17
Calculated Percent Relative Compaction: 97.2 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/2/2022 ✔
