Summary for Test 2022-08-18-52-2
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 214640 DEA: 042J7204 EFIS: 0415000016 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-580-1.17 |
| Award Date | 02/25/2021 |
| Closeout Date | 12/01/2023 |
| Work Description | STEGE DRAIN SUPER-STRUCTURE, PRECAST VOIDED SLABS |
| Location Description | CONTRA COSTA COUNTY IN RICHMOND FROM 0.3 MILE EAST OF STEGE DRAIN BRIDGE TO 0.3 MILE WEST OF BAYVIEW AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 01/27/2020) |
Sample Information
| Sample Taken Date | 08/18/2022 | Sample Unique Key | 52 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/18/2022 |
| Sample type | Quality Control | A brief description of the sample | Concrete |
| The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Nicole | Last name of sampler or witnessed by | Marcal |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Central Concrete | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 4EACC5KS |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 179178 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Stage 4 deck SE corner | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-08-18-52
DIME Test ID: 2022-08-18-52-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2022-08-25
Test Results
Input Type: Calculated
Tester's full name: Nicole Marcal
Date of test: 08/18/2022
Air Content: 1.4 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/25/2022 ✔
