Summary for Test 2022-08-16-33-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 214573 DEA: 073096U4 EFIS: 0719000091 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R0.0/R9.7 |
| Award Date | 04/03/2020 |
| Closeout Date | 06/06/2024 |
| Work Description | PLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 06/05/2020) |
Sample Information
| Sample Taken Date | 08/16/2022 | Sample Unique Key | 33 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/16/2022 | Sample type | Department Acceptance |
| A brief description of the sample | 3/8" HMA-A DIKE | The quantity of what the sample constitutes | 18 tons |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Avo |
| Last name of sampler or witnessed by | Karajian | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | 22-0229 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Materials Sun Valley | |
| Transportation Laboratory (TL) Number | 019430 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/8 inch | Lot number | |
| Sublot number | HMA Mix Number | Not set | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2022-08-16-33
DIME Test ID: 2022-08-16-33-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-08-18
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Daniel Gomez
Date of test: 08/18/2022
Test procedure used?: Method A
Mass of the specimen basket assembly: no data
Mass of the specimen and specimen basket assembly prior to ignition: no data
Mass of HMA Sample prior to ignition: 1601.4 g
Mass Loss: no data
Mass of aggregate remaining after ignition: 1498.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: no data
Test Temperature: 1000.4 F
Corrected Asphalt Binder Content: 6.40 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/18/2022 ✔