Summary for Test 2022-08-09-17-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993771 DEA: 07325204 EFIS: 0716000082 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R36.7/R37.1 |
| Award Date | 02/15/2022 |
| Closeout Date | 01/29/2024 |
| Work Description | San Gabriel River Bridge - CM/GC Project - Hinge And Diaphragm Repairs |
| Location Description | Los Angeles County - LOS ANGELES COUNTY IN IRWINDALE FROM 0.2 MILE EAST OF 0.7 MILE WEST OF IRWINDALE AVENUE OVECROSSING |
| QA Service Level | 1 (Verified on 04/21/2022) |
Sample Information
| Sample Taken Date | 08/09/2022 | Sample Unique Key | 17 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/15/2022 |
| Sample type | Quality Assurance | A brief description of the sample | Double Barrel Zap Screwlok |
| The quantity of what the sample constitutes | 270 Couplers | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Quynh | Last name of sampler or witnessed by | Nguyen |
| Title of sampler | SR | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Pacific Steel Group | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 53-1867 | |
| Structure name | San Gabriel River Bridge | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #4 | Coupler Model | Double Barrel Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 1043 | Rebar Heat Number(s) | 3500024563 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2022-08-09-17
DIME Test ID: 2022-08-09-17-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2022-08-17
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 08/15/2022
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | No. 4/13mm | 1 | 0 | 0.2 | 18379 | 91895 | service splice | spaine |
General comments (publicly viewable) (Max 1000 characters): service splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 8/17/2022 ✔
