Summary for Test 2022-08-08-36-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 993649 DEA: 081M0304 EFIS: 0821000062 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-177-0.0/27.0 |
| Award Date | 05/23/2022 |
| Closeout Date | 03/27/2023 |
| Work Description | PLACE RUBBERIZED HMA, TRAFFIC STRIPING & COLD PLANE ASPHALT CONCRETE. |
| Location Description | RIVERSIDE COUNTY NEAR DESERT CENTER FROM ROUTE 10/177 SEPARATION TO ROUTE 62 |
| QA Service Level | 1 (Verified on 07/27/2022) |
Sample Information
| Sample Taken Date | 08/08/2022 | Sample Unique Key | 36 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/09/2022 |
| Sample type | Verification | A brief description of the sample | PG asphalt Binder |
| The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | MM QC | Last name of sampler or witnessed by | MM QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marieta-Coachella | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Wilmington CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2022-08-08-36
DIME Test ID: 2022-08-08-36-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-08-18
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Babak Rezaei
Date of test: 08/10/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 176.521 grams
Mass of empty container #2: 167.309 grams
Mass of container #1 before test (m1i): 211.362 grams
Mass of container #2 before test (m2i): 202.590 grams
Mass of container #1 after test (m1f): 211.157 grams
Mass of container #2 after test (m2f): 202.391 grams
Average mass change: -0.576 percent
General comments (publicly viewable) (Max 1000 characters): -0.576+0.006=-0.570
Test was verified on 8/18/2022 ✔
