Summary for Test 2022-08-02-49-1
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 214640 DEA: 042J7204 EFIS: 0415000016 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-580-1.17 |
| Award Date | 02/25/2021 |
| Closeout Date | 12/01/2023 |
| Work Description | STEGE DRAIN SUPER-STRUCTURE, PRECAST VOIDED SLABS |
| Location Description | CONTRA COSTA COUNTY IN RICHMOND FROM 0.3 MILE EAST OF STEGE DRAIN BRIDGE TO 0.3 MILE WEST OF BAYVIEW AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 01/27/2020) |
Sample Information
| Sample Taken Date | 08/02/2022 | Sample Unique Key | 49 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/02/2022 | Sample type | Quality Control |
| A brief description of the sample | Concrete | The quantity of what the sample constitutes | 100 cy |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Ryan |
| Last name of sampler or witnessed by | MacDonald | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Central Concrete | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 4EACC5KS |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 167903 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | abutment 2 stage 4, total 46 yards | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-08-02-49
DIME Test ID: 2022-08-02-49-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2022-08-09
Test Results
Input Type: Calculated
Tester's full name: Ryan MacDonald
Date of test: 08/02/2022
Temperature: 79 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/9/2022 ✔
