Summary for Test 2022-07-26-30-3

Test performed: CTM 518-June 2010

Project Information

Project IdentifiersProject ID: 215063
DEA: 032F5704
EFIS: 0300020615
DIST-CO-RTE-PM03-PLA-80-46.3/63.5
Award Date09/23/2020
Closeout Date08/11/2023
Work DescriptionReplace 4 Bridges (OC) on Highway 80 from Crystal Springs to Cisco Grove (Baxter, Drum Forebay)
Location DescriptionNot set
QA Service Level1 (Verified on 11/16/2020)

Sample Information

Sample Taken Date07/26/2022 Sample Unique Key30
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/26/2022
Sample typeQuality Control A brief description of the sampleConcrete
The quantity of what the sample constitutes100 cy From where was the sample collectedJob Site
First name of sampler or witnessed byJose Last name of sampler or witnessed byMurillo
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHansen Bros Enterprises Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number7325-6
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected05-201103
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBents caps on the westbound side of Cisco Grove Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2022-07-26-30
DIME Test ID: 2022-07-26-30-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2022-07-29

Test Results


Input Type: Calculated
Tester's full name: JOSE MURILLO
Date of test: 07/26/2022
Unit weight of the concrete: 140.5 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/29/2022