Summary for Test 2016-07-25-7-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 208945 DEA: 07288604 EFIS: 0700021080 COOP: 074663 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-710-6.0-9.4 |
| Award Date | 09/02/2011 |
| Closeout Date | Not set |
| Work Description | Gerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing. |
| Location Description | Port of Long Beach (District 7) |
| QA Service Level | 1 (Verified on 06/03/2013) |
Sample Information
| Sample Taken Date | 07/25/2016 | Sample Unique Key | 7 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/26/2016 |
| Sample type | Quality Assurance | A brief description of the sample | Flash Welded Rebar Hoops |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Santos | Last name of sampler or witnessed by | Vargas |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | CMC Rebar | Transportation Laboratory (TL) Number | C952528 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | L10002216 | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 4056645 |
| Hoop Manufacturer Lot Number(s) | 5 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | 5 |
| Diameter of Hoop | 1'-4" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | CMC Rebar |
| Welding Company | CMC Rebar (Etiwanda) | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2016-07-25-7
DIME Test ID: 2016-07-25-7-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2016-07-28
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 07/28/2016
UTM: 400KIP
Temperature: 72 F
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 3 | 5 | #5/16mm | 0.31 | 31170 | 100550 | Bar Broke | Fred |
General comments (publicly viewable) (Max 1000 characters): Bar Broke; OK Necking
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 7/28/2016 ✔
