Summary for Test 2022-07-14-76-2
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 993112 DEA: 021H4704 EFIS: 0216000044 |
---|---|
DIST-CO-RTE-PM | 02-TEH-5-36.3/41.6 |
Award Date | 10/06/2021 |
Closeout Date | 07/27/2023 |
Work Description | ROADWAY EXCAVATION, HMA (TYPE A), CULVERT WORK AND RSP. |
Location Description | TEHAMA COUNTY NEAR RED BLUFF FROM NINE MILE HILL OVERCROSSING TO 0.1 MILE NORTH OF BOWMAN ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 08/23/2021) |
Sample Information
Sample Taken Date | 07/14/2022 | Sample Unique Key | 76 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/15/2022 |
Sample type | Department Acceptance | A brief description of the sample | Combined RAP |
The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | JD | Last name of sampler or witnessed by | Atkinson |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | D79095B | Linked DIME Sample ID | 2022-07-14-74, 2022-07-14-75 |
The fabricator/manufacturer/facility name | Tullis – Northstate Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 037266 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Northstate Asphalt |
---|---|---|---|
Aggregate Size | 1/2-inch | Aggregate Source | |
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2022-07-14-76
DIME Test ID: 2022-07-14-76-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-07-29
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Khue Yang and Arthur Mills
Date of test: 07/19/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.88 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/29/2022 ✔