Summary for Test 2022-07-09-20-1
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 214671 DEA: 07303904 EFIS: 0714000044 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-31.2/37.2 |
Award Date | 11/25/2020 |
Closeout Date | 10/11/2023 |
Work Description | LANE REPLACEMENT |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/21/2021) |
Sample Information
Sample Taken Date | 07/09/2022 | Sample Unique Key | 20 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/09/2022 |
Sample type | Quality Assurance | A brief description of the sample | A set of 2 LCB-RSC cylinders |
The quantity of what the sample constitutes | 500 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Ian | Last name of sampler or witnessed by | Snyder |
Title of sampler | Field Materials Tester | Telephone number of sampler | 15628339318 |
Laboratory sample identification | 22-1704 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Security Paving Plant - Baldwin Park | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | G3-22-LRS-271 |
---|---|---|---|
The truck number from where the sample was collected | NOT PROVIDED | The batch plant ticket number from where the sample was collected | Load 65 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Concrete from wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-07-09-20
DIME Test ID: 2022-07-09-20-1
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2022-07-18
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Ian Snyder
Date of test: 07/16/2022
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 6.00 in
Average diameter of cylinder 2: 6.00 in
Maximum load on cylinder 1: 91590 lb
Maximum load on cylinder 2: 87070 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Age of specimen: 7 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 6 in^2
Cross sectional area of cylinder 2: 6 in^2
Compressive strength (to nearest 10 psi): 3160 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/18/2022 ✔