Summary for Test 2021-10-20-55-3

Test performed: CTM TEMP1-16

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Sample Information

Sample Taken Date10/20/2021 Sample Unique Key55
Date that the sample was received by the laboratory/organization performing the testing10/20/2021 Sample typeQuality Control
A brief description of the sample4x8 concrete cylinders The quantity of what the sample constitutes1 Day Production
From where was the sample collectedManufacturer First name of sampler or witnessed byWilfredo
Last name of sampler or witnessed byBucaneg Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameRinker Materials
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numbermix5
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected2
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBesser Hopper Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-10-20-55
DIME Test ID: 2021-10-20-55-3
Testing Lab: Rinker Materials
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2022-07-16

Test Results


Input Type: Calculated
Tester's full name: Wilfredo Bucaneg
Date of test: 10/20/2021
Precast Maximum Curing Temperature: 131.5 °F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/16/2022 ✔