Summary for Test 2021-11-10-65-3
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 215236 DEA: 081C6804 EFIS: 0812000343 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74,79and371-Varies |
| Award Date | 12/29/2020 |
| Closeout Date | 07/07/2025 |
| Work Description | REPLACE STRUCTURAL CONCRETE BRIDGE, RETAINING WALL AND BOX CULVERT. |
| Location Description | RIVERSIDE COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 03/02/2021) |
Sample Information
| Sample Taken Date | 11/10/2021 | Sample Unique Key | 65 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/11/2021 |
| Sample type | Quality Control | A brief description of the sample | 1", 3/8", sand |
| The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
| First name of sampler or witnessed by | Randy | Last name of sampler or witnessed by | Black |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | cemex perris | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0040 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | conveyor belt | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | 1610974 | Lot number | |
| Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-11-10-65
DIME Test ID: 2021-11-10-65-3
Testing Lab: Sequoia Consultants
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-07-14
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Jesse Uranga
Date of test: 11/15/2021
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 99 % | ||||||
| 87 % | ||||||
| 47 % | ||||||
| 29 % | ||||||
| 12 % | ||||||
| 6 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/14/2022 ✔
