Summary for Test 2022-06-01-53-1
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 |
---|---|
DIST-CO-RTE-PM | 07-LA-I-5-45.4/54 |
Award Date | 07/01/2021 |
Closeout Date | Not set |
Work Description | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley |
Location Description | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. |
QA Service Level | 2 (Verified on 02/03/2021) |
Sample Information
Sample Taken Date | 06/01/2022 | Sample Unique Key | 53 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/02/2022 |
Sample type | Quality Control | A brief description of the sample | Structural Concrete |
The quantity of what the sample constitutes | 65 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Shiavhonne | Last name of sampler or witnessed by | Black |
Title of sampler | Field Technician | Telephone number of sampler | 657-348-1102 |
Laboratory sample identification | C060122-401 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | National Ready Mix Concrete Company | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 53-3095 | |
Structure name | Weldon Canyon Bridge |
Material Information
Material Type | Concrete | The concrete mix design number | S63C451T1 |
---|---|---|---|
The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 267878 |
Concrete batch plant | Santa Clarita | The fabricator/manufacturer designation for the sample | Batch plant |
A detailed description of where the material sample was collected | Concrete from wheelbarrow | Where the material sample would have been placed if not sampled | Spread Footings |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-06-01-53
DIME Test ID: 2022-06-01-53-1
Testing Lab: Sequoia Consultants
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2022-07-13
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Julio Lugo
Date of test: 06/29/2022
Capped in accordance with?: ASTM C1231 - Unbonded Elastomeric Pad Cap
Average diameter of cylinder 1: 6.00 in
Average diameter of cylinder 2: 6.00 in
Maximum load on cylinder 1: 117020 lb
Maximum load on cylinder 2: 121560 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.27 in^2
Cross sectional area of cylinder 2: 28.27 in^2
Compressive strength (to nearest 10 psi): 4220 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/13/2022 ✔