Summary for Test 2022-06-23-55-4
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215632 DEA: 074W5104 EFIS: 0718000365 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-0.8/47.8 |
| Award Date | 06/02/2021 |
| Closeout Date | 07/03/2023 |
| Work Description | DECK REPAIR, CLEAN EXPANSION JOINTS, REPLACE JOINT SEAL. |
| Location Description | IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF STERNS STREET UNDERCROSSING TO RINALDI STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 08/17/2021) |
Sample Information
| Sample Taken Date | 06/23/2022 | Sample Unique Key | 55 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/06/2022 | Sample type | Per Request |
| A brief description of the sample | PG Asphalt Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Gerardo |
| Last name of sampler or witnessed by | Zubieta | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0422-22 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | AAA-Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | Not set | |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2022-06-23-55
DIME Test ID: 2022-06-23-55-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-07-13
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Babak Rezaei
Date of test: 07/08/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 172.723 grams
Mass of empty container #2: 167.309 grams
Mass of container #1 before test (m1i): 207.887 grams
Mass of container #2 before test (m2i): 202.321 grams
Mass of container #1 after test (m1f): 207.861 grams
Mass of container #2 after test (m2f): 202.291 grams
Average mass change: -0.080 percent
General comments (publicly viewable) (Max 1000 characters): -0.080+.006=-0.074
Test was verified on 7/13/2022 ✔
