Summary for Test 2022-05-16-56-2
Test performed: ASTM C143-20Project Information
| Project Identifiers | Project ID: 993124 DEA: 101F1704 EFIS: 1016000032 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-26,99-1.1,19.3 |
| Award Date | 09/07/2021 |
| Closeout Date | 08/30/2023 |
| Work Description | REMOVE AND REPLACE BRIDGE. |
| Location Description | SAN JOAQUIN COUNTY NEAR STOCKTON AT ROUTE 26/99 SEPARATION |
| QA Service Level | 1 (Verified on 07/23/2021) |
Sample Information
| Sample Taken Date | 05/16/2022 | Sample Unique Key | 56 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/16/2022 | Sample type | Quality Control |
| A brief description of the sample | Concrete | The quantity of what the sample constitutes | 100 cy |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Ryan |
| Last name of sampler or witnessed by | MacDonald | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Cemex | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1616182 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 30241258 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | North Median bent cap and footing at HWY 99 Fremont Overpass | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-05-16-56
DIME Test ID: 2022-05-16-56-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2022-07-05
Test Results
Input Type: Calculated
Tester's full name: Ryan MacDonald
Date of test: 05/16/2022
Slump: 4 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/5/2022 ✔
