Summary for Test 2022-06-23-4-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993183 DEA: 031H2704 EFIS: 0316000082 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-70-R11.2/13.5 |
| Award Date | 10/14/2021 |
| Closeout Date | Not set |
| Work Description | UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER. |
| Location Description | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD |
| QA Service Level | 1 (Verified on 08/16/2021) |
Sample Information
| Sample Taken Date | 06/23/2022 | Sample Unique Key | 4 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/23/2022 | Sample type | Quality Assurance |
| A brief description of the sample | #4 Zap Screwlok Couplers | The quantity of what the sample constitutes | 150 Couplers |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Kaveh |
| Last name of sampler or witnessed by | Aladini | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Pacific Steel Group | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #4 | Coupler Model | Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | A205906 | Rebar Heat Number(s) | 3500023721 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2022-06-23-4
DIME Test ID: 2022-06-23-4-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2022-06-27
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 06/27/2022
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | No. 4/13mm | 1 | 0 | 0.2 | 17432 | 87162 | service splice | spaine |
General comments (publicly viewable) (Max 1000 characters): service splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 6/27/2022 ✔
