Summary for Test 2022-05-31-15-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 993771 DEA: 07325204 EFIS: 0716000082 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R36.7/R37.1 |
| Award Date | 02/15/2022 |
| Closeout Date | 01/29/2024 |
| Work Description | San Gabriel River Bridge - CM/GC Project - Hinge And Diaphragm Repairs |
| Location Description | Los Angeles County - LOS ANGELES COUNTY IN IRWINDALE FROM 0.2 MILE EAST OF 0.7 MILE WEST OF IRWINDALE AVENUE OVECROSSING |
| QA Service Level | 1 (Verified on 04/21/2022) |
Sample Information
| Sample Taken Date | 05/31/2022 | Sample Unique Key | 15 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/02/2022 | Sample type | Verification |
| A brief description of the sample | PG Asphalt Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Victor |
| Last name of sampler or witnessed by | Pham | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0324-22 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan-Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Marathon Petroleum Co. LP S. 19th Ave. - Phoenix AZ | Multigrade | Yes |
| Multigrade Type | PG 64-16 / PG 64-10 | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2022-05-31-15
DIME Test ID: 2022-05-31-15-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-06-13
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 06/06/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.300 grams
Mass of empty container #2: 169.574 grams
Mass of container #1 before test (m1i): 201.848 grams
Mass of container #2 before test (m2i): 204.587 grams
Mass of container #1 after test (m1f): 201.819 grams
Mass of container #2 after test (m2f): 204.557 grams
Average mass change: -0.085 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/13/2022 ✔
