Summary for Test 2016-06-24-1-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 209114 DEA: 040A7104 EFIS: 0400000160 COOP: 042550 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-880-28.4/29.2 |
| Award Date | 04/30/2014 |
| Closeout Date | 07/23/2020 |
| Work Description | WIDEN ROADS, RECONSTRUCT RAMPS WITH HMA, REPLACE 2 CONC OVERCROSSINGS. |
| Location Description | ALAMEDA COUNTY IN ALAMEDA AND OAKLAND FROM 0.2 MILE SOUTH OF 29TH AVENUE OVERCROSSING TO 0.3 MILE NORTH OF 23RD AVENUE OVERCROSSING. |
| QA Service Level | 1 (Verified on 10/11/2013) |
Sample Information
| Sample Taken Date | 06/24/2016 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/24/2016 |
| Sample type | Quality Assurance | A brief description of the sample | Bartec Couplers |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | ED | Last name of sampler or witnessed by | Fleming |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Harris Rebar | Transportation Laboratory (TL) Number | C711166 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | B1027916 | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | Dextra | Intermediate Assembler or Fabricator | Unknown |
| Rebar Size | #11 | Coupler Model | Bartec |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | DL14401108 | Rebar Heat Number(s) | SE15104089 SE15104618 |
| Rebar Size 2 | NA | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2016-06-24-1
DIME Test ID: 2016-06-24-1-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2016-06-28
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 06/27/2016
UTM: 2000KIP
Halo ID: Big
Temperature: 72 F
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | C04 | #11/36mm | 1.56 | 0 | 136526 | 87517 | necking okay | Fred |
General comments (publicly viewable) (Max 1000 characters): necking okay
Test Graph
WARNING: No graph data imported from Instron machine.
Test was verified on 6/28/2016 ✔
