Summary for Test 2022-04-15-52-1

Test performed: AASHTO T27-14

Project Information

Project IdentifiersProject ID: 993150
DEA: 051G9704
EFIS: 0516000008
DIST-CO-RTE-PM05-SB-135-11.7/17.8
Award Date09/27/2021
Closeout Date03/28/2023
Work DescriptionCOLD PLANE, OVERLAY ROADWAY WITH RHMA (GAP GRADED) AND ADA CURB RAMPS.
Location DescriptionSANTA BARBARA COUNTY IN AND NEAR SANTA MARIA FROM LAKEVIEW ROAD TO NORTH SANTA MARIA CONNECTOR
QA Service Level1 (Verified on 08/09/2021)

Sample Information

Sample Taken Date04/15/2022 Sample Unique Key52
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/15/2022
Sample typeQuality Assurance A brief description of the sample3/4" coldfeed
The quantity of what the sample constitutesL1SL2 From where was the sample collectedFabricator
First name of sampler or witnessed bySalvador Last name of sampler or witnessed byLopez-zamora
Title of sampler Telephone number of sampler8057483854
Laboratory sample identificationL1SL2 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalportland-Garey Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number2 HMA Mix NumberNot set

Test Details

DIME Sample ID: 2022-04-15-52
DIME Test ID: 2022-04-15-52-1
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2022-05-31

Test Results


What type of gradation is being tested?: HMA Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Salvador Lopez-Zamora
Date of test: 04/18/2022
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 95.9 %
Cumulative percent passing the 1/2 in. sieve: 83.4 %
Cumulative percent passing the 3/8 in. sieve: 65.6 %
Cumulative percent passing the #4 sieve: 40.4 %
Cumulative percent passing the #8 sieve: 68.8 %
Cumulative percent passing the #16 sieve: 49.5 %
Cumulative percent passing the #30 sieve: 37.6 %
Cumulative percent passing the #50 sieve: 26.7 %
Cumulative percent passing the #100 sieve: 17.1 %
Cumulative percent passing the #200 sieve: 11.1 %
General comments (publicly viewable) (Max 1000 characters): #4 below minimum operating range 46 (44). #8 below minimum operating range 32 (31).

Test was verified on 5/31/2022