Summary for Test 2022-04-01-32-3
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 04/01/2022 | Sample Unique Key | 32 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/01/2022 |
Sample type | Department Acceptance | A brief description of the sample | LCB |
The quantity of what the sample constitutes | 1200 cy | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Zaid | Last name of sampler or witnessed by | Abdelkhaliq |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | SECURITY PAVING PORTABLE PLANT- LA MIRADA | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | LCB - Recycled |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Conveyer Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | G3-22-LRS-271R | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-04-01-32
DIME Test ID: 2022-04-01-32-3
Testing Lab: CT D07 - Plant Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-07-13
Test Results
Number of tests: 1
Input Type: Calculated
Tester's full name: Zaid Abdelkhaliq
Date of test: 04/01/2022
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 83
Sand reading (test 1): 37
Sand equivalent (test 1): 41
Sand equivalent before temperature correction: 0
Sand equivalent after temperature correction: 0
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/13/2022 ✔