Summary for Test 2016-06-10-14-2
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 209576 DEA: 11263304 EFIS: 1100000743 |
|---|---|
| DIST-CO-RTE-PM | 11-IMP-8-R38.8/R39.1 |
| Award Date | 07/30/2014 |
| Closeout Date | 04/09/2018 |
| Work Description | BRIDGE REPLACEMENT AND MODIFY INTERCHANGE. |
| Location Description | IMPERIAL COUNTY IN EL CENTRO FROM 0.2 MILE WEST TO 0.1 MILE EAST OF DOGWOOD ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 11/11/2014) |
Sample Information
| Sample Taken Date | 06/10/2016 | Sample Unique Key | 14 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/22/2016 |
| Sample type | Quality Assurance | A brief description of the sample | Lenton Couplers |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Michael | Last name of sampler or witnessed by | Nghyen |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | 1 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | CMC Rbar | Transportation Laboratory (TL) Number | C384238 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
| Coupler Manufacturer | Erico | Intermediate Assembler or Fabricator | CMC Rebar |
| Rebar Size | #11 | Coupler Model | Lenton |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | L8755 | Rebar Heat Number(s) | 4055184 |
| Rebar Size 2 | NA | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2016-06-10-14
DIME Test ID: 2016-06-10-14-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2016-06-23
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 06/23/2016
UTM: 2000KIP
Halo ID: Big
Temperature: 72 F
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | 1 | #11/36mm | 1.56 | 0 | 139112 | 89174 | Service Splice | Brian |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
WARNING: No graph data imported from Instron machine.
Test was verified on 6/23/2016 ✔
