Summary for Test 2022-05-22-1-5
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993234 DEA: 051H0004 EFIS: 0516000011 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-68-1.1/L4.3 |
| Award Date | 10/26/2021 |
| Closeout Date | 12/14/2023 |
| Work Description | PLACE HMA AND MODIFY SIGNAL AND LIGHTING SYSTEMS. |
| Location Description | MONTEREY COUNTY IN AND NEAR PACIFIC GROVE AND MONTEREY FROM FOREST AVENUE TO ROUTE 68/1 SEPARATION |
| QA Service Level | 1 (Verified on 10/06/2021) |
Sample Information
| Sample Taken Date | 05/22/2022 | Sample Unique Key | 1 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/22/2022 | Sample type | Department Acceptance |
| A brief description of the sample | 3/4" HMA Type A | The quantity of what the sample constitutes | 20 Box's HMA-A |
| From where was the sample collected | Fabricator | First name of sampler or witnessed by | Jerrod |
| Last name of sampler or witnessed by | Naval | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Graniterock Aromas Drum Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 18 | HMA Mix Number | Not set |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2022-05-22-1
DIME Test ID: 2022-05-22-1-5
Testing Lab: CT D05 - Monterey Construction Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-05-23
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Wesley Rider
Date of test: 05/22/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.97 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.27 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/23/2022 ✔