Summary for Test 2022-05-12-41-1

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award Date04/03/2020
Closeout Date06/06/2024
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date05/12/2022 Sample Unique Key41
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/12/2022
Sample typeDepartment Acceptance A brief description of the samplesoils for subgrade
The quantity of what the sample constitutes26 CY From where was the sample collectedJob Site
First name of sampler or witnessed byJacinto Last name of sampler or witnessed byVillanueva
Title of samplerTEC Telephone number of sampler81820965747
Laboratory sample identification22-1121 Linked DIME Sample ID
The fabricator/manufacturer/facility nameFlatiron Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFrom various locations at subgrade.
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2022-05-12-41
DIME Test ID: 2022-05-12-41-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2022-05-22

Test Results


Is oversize material: Yes
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 05/12/2022
In-place wet density: 2.31
Percentage passing 3/4 in. sieve: 87 %
Percentage retained on 3/4 in. sieve: 13 %
Specific gravity of material passing 3/4 in. sieve: 2.37
Specific gravity of material retained on 3/4 in. sieve: 2.5 %
% Moisture: 3.6 %
Optimum Moisture: no data
Coefficient for 3/4 in. aggregate: 1
Corrected density: 2.39
Relative compaction: 97
General comments (publicly viewable) (Max 1000 characters): WB Rte 210 At Arroyo Lane #4 and Shoulder Departure Sta 288+52 to Sta 288+82

Test was verified on 5/22/2022