Summary for Test 2022-05-07-15-6
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 214671 DEA: 07303904 EFIS: 0714000044 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-31.2/37.2 |
Award Date | 11/25/2020 |
Closeout Date | 10/11/2023 |
Work Description | LANE REPLACEMENT |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/21/2021) |
Sample Information
Sample Taken Date | 05/07/2022 | Sample Unique Key | 15 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/10/2022 |
Sample type | Department Acceptance | A brief description of the sample | 1x4 PCC Aggregates |
The quantity of what the sample constitutes | 1950 cy | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Victor | Last name of sampler or witnessed by | Pham |
Title of sampler | Telephone number of sampler | 2137924794 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Vulcan Durbin Irwindale | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0023 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | Mix G3-21-PRS-237 | |
The plant number | Irwindale | A detailed description of where the material sample was collected | Conveyor Belt |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | G3-21-PRS-237 | Lot number | |
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2022-05-07-15
DIME Test ID: 2022-05-07-15-6
Testing Lab: CT D07 - Plant Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-05-17
Test Results
Number of tests: 2
Input Type: Measured
Tester's full name: Victor Pham
Date of test: 05/12/2022
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.2
Sand reading (test 1): 3.9
Clay reading (test 2): 4.7
Sand reading (test 2): 4.5
Sand equivalent (test 1): 93
Sand equivalent (test 2): 96
Sand equivalent before temperature correction: 95
Sand equivalent after temperature correction: 95
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/17/2022 ✔