Summary for Test 2022-04-25-15-6

Test performed: AASHTO T329-13

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date04/25/2022 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/25/2022
Sample typeVerification A brief description of the sample1/2" RHMA-G PG 64-16 with 0.25% LAS15% RAP
The quantity of what the sample constitutes24 Boxes, 4 Qt cans of binder From where was the sample collectedSupplier
First name of sampler or witnessed byAkira Last name of sampler or witnessed byHasegawa
Title of samplerMREA Telephone number of sampler
Laboratory sample identification022-012 Linked DIME Sample ID
The fabricator/manufacturer/facility nameDeer Creek Porterville Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading1/2 inch Lot number
Sublot number HMA Mix NumberNot set

Test Details

DIME Sample ID: 2022-04-25-15
DIME Test ID: 2022-04-25-15-6
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T329-13: Standard Method of Test for Moisture Content of Asphalt Mixtures by Oven Method (Moisture Content)
Test Release Date: 2022-05-13

Test Results


Input Type: Calculated
Tester's full name: Glenn Bradley
Date of test: 05/13/2022
Moisture Content: 0.2 %
Percent Change: 0.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/13/2022