Summary for Test 2022-04-19-14-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 993236
DEA: 051K0504
EFIS: 0518000114
DIST-CO-RTE-PM05-MON-1-55.7/55.9
Award Date10/14/2021
Closeout Date09/02/2022
Work DescriptionCONSTRUCT EARTH RETAINING SYSTEM WITH CIDH PILE & STRUCTURAL CONCRETE.
Location DescriptionMONTEREY COUNTY NEAR LITTLE SUR RIVER FROM 0.4 MILE SOUTH OF LITTLE SUR RIVER BRIDGE TO 0.2 MILE SOUTH OF LITTLE SUR RIVER BRIDGE
QA Service Level1 (Verified on 10/06/2021)

Sample Information

Sample Taken Date04/19/2022 Sample Unique Key14
Date that the sample was received by the laboratory/organization performing the testing04/19/2022 Sample typeDepartment Acceptance
A brief description of the sample3/4" HMA-SP-A-WMA-R15% PG64-10 SJR The quantity of what the sample constitutes160 tons
From where was the sample collectedSource First name of sampler or witnessed byWesley
Last name of sampler or witnessed byRider Title of samplerTET
Telephone number of sampler Laboratory sample identification0419221000
Linked DIME Sample ID2022-04-19-15 The fabricator/manufacturer/facility nameGranite Salinas Batch
Transportation Laboratory (TL) Number0419221 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number1 HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Test Details

DIME Sample ID: 2022-04-19-14
DIME Test ID: 2022-04-19-14-1
Testing Lab: CT D05 - Monterey Construction Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-04-19

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Wesley Rider
Date of test: 04/19/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.32 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.96 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/19/2022 ✔